  • Prefeasibility Study, Integrated Metro System for Surat

Aarav Arora

UT4002

Prefeasibility Study, Integrated Metro System for Surat

Indian metro projects often promise more than they deliver. Lucknow's DPR shows an 8.12% FIRR on steep demand growth, and across 14 city DPRs, actual ridership is only about a third of forecast once Delhi is excluded. This studio asks how Surat can avoid that outcome while preparing an integrated public transport system for 2057. The study draws lessons from Lucknow, the national comparison and Singapore, then builds three land use scenarios (BAU, Compact and Polycentric) and tests each with EMME travel demand modelling. BAU fails, with 53% congestion and only a 20% PT share. Polycentric proves the most workable, with a 40% PT share and a 106 km metro carrying about 28.8 lakh riders a day. The study then sizes two depots (39 ha) and tests financial and economic viability. The best case gives an FIRR of 5.00% and an EIRR of 24.1%, so the project is economically strong but needs public funding support, TOD and good last-mile access to succeed. 


Report Content

About the Studio

Lucknow Metro DPR: Corridor Details, Travel Demand Projections and Rolling Stock Specifications & Firr

National Metro DPR Comparative Analysis: Trip Length Distribution, Mode Share

International case study: Singapore Metro

Scenario Development for Surat 2057

Rapid Transit corridor identifications BAU

Scenario Selection for Surat 2057

Depots: Requirement & key layout

Surat Metro Financial Analysis: Financial Internal Rate of Return (FIRR) for Project Phasing Options

Conclusion