Yukta Dutt

UD4007-3

Emerging Centre- From Utility to Urban Catalyst

Situated along the Sabarmati Riverfront, the former AEC Thermal Power Plant is currently a disconnected industrial block. Despite sitting right next to the Metro and the Sabarmati HSR Terminal, its strategic location remains untapped. Grounded in New Urbanist principles, this proposal transforms the brownfield site into a vibrant and pedestrian-first community. It achieves this through four core objectives: retaining the iconic chimneys as a cultural anchor, connecting the site via a 5-minute walkable grid and a 6-meter mid-block NMT loop, activating the public realm, and diversifying the urban fabric. By replacing boundary walls and car-centric layouts with permeable streets and active ground-floor edges, the design seamlessly reconnects the neighbourhood to Ahmedabad.


Report Content

Site Context and potential of site

Existing Gaps and Principles of New Urbanism

Objectives and Strategies

Masterplan and distinct character zones

Building use and Metrics of Urban form

Social Infrastructure and Anchors

Open space Programming

Plot level and Built Guidelines

Building mass and guidelines

Experience in the neighbourhood Block