• Home
  • FP
  • UP4001-4
  • Viramgam Micro-Planning: A Framework for Urban Renewal

Rajput Neha Deepak Sarala

UP4001-4

Viramgam Micro-Planning: A Framework for Urban Renewal

This project explores how Viramgam, a town shaped by strong regional linkages, can grow in a more organised and sustainable way. The study looks closely at its existing road network, land use patterns, natural features, and everyday movement to understand where the town functions smoothly and where gaps appear. Using a Town Planning Scheme approach, the proposal strengthens key road connections, improves access to public transport, and integrates green and blue networks. The plan aims to guide new development, support mixed-use activity, reduce flooding risks, and ensure that open spaces and public facilities are evenly shared across the Study area.


Report Content

Key statutory framework shaping planning and governance in Viramgam.

Existing road network, hierarchy, and transportation patterns of Viramgam.

Built–unbuilt analysis, land use distribution, and land ownership patterns.Physical and social infrastructure along with contour and watershed mapping.

Stakeholder insights—strengths, issues, and emerging concerns of Viramgam.Opportunities and key observations from stakeholder interactions.

Study area delineation and its existing road network conditions. Proposed road network and public transport structure.

Development potential analysis based on connectivity and road hierarchy. Green streets and green corridor proposals with sectional illustrations.

Land reconstitution—original plots versus final plots under the TP Scheme. Distribution of open spaces, amenities, and sale plots in TP reconstitution.

Existing water supply and sewage treatment infrastructure overview. Proposed WTP/STP strategy aligning with projected population.

Reconstitution principles with iterative plot refinement process. F-Form and G-Form explaining incremental factors and plot valuation. Phasing plan and costing components across the TP Scheme.

Cashflow statement, IRR, and NPV indicating financial viability.