For a richer surfing experience on our website, please update your browser. Update my browser now!
The project focuses on the feasibility assessment of a Sewage Treatment Plant (STP) integrated with a Sewage Pumping Station (SPS) in the eastern part of Ahmedabad. The proposed development aims to strengthen the sewerage infrastructure through an integrated system of sewage collection, conveyance, pumping, treatment and final disposal. The scope includes the design, construction, procurement, installation, testing and commissioning of the complete infrastructure, with a construction period of 30 months, including a minimum three-month trial operation, followed by 10 years of operation and maintenance. Throughout the semester, the project was examined through a series of interconnected studies covering project context and problem analysis, work and cost breakdown structures, location suitability, macro- and micro-level sewage demand forecasting, cost-benefit analysis, financial appraisal, construction contracts, stakeholder management, risk assessment and sustainability strategies. Collectively, these studies provided an understanding of how technical requirements, future sewage demand, financial viability, construction planning and environmental considerations influence the feasibility and implementation of a large-scale urban infrastructure project.