The Construction Project Execution Monitoring and Control studio evaluated the execution phase of a new river over-bridge in the Ahmedabad region, constructed to replace an existing structure that frequently submerges during the monsoon season, disrupting critical village connectivity. The infrastructure spans 300 meters in length and 12 meters in width, featuring a 9.5-meter carriageway and a 1.3-meter pedestrian walkway. During the four-month studio, we conducted a comprehensive project analysis encompassing pre-construction planning, risk management, Earned Value Analysis, and operational controls such as pour planning, material management, Lean methodology, and contract administration. By identifying critical execution delays and operational bottlenecks, we developed actionable deliverables to support the on-site team. These included optimized site layout arrangements, alongside standardized procedures and checklists for material handling, non-conformity protocols, and contract management, all designed to significantly enhance safety and quality control throughout the project's execution.


Report Content

Project Brief

Equipment Planning- Hoisting Equipment

Equipment Planning- Excavation Equipment

Equipment Planning- Concreting Equipment

Equipment Planning- Steel Yard Equipment

Contract Administration- Procedure and SCC Clauses

Contract Administration- Price Adjustment, Claims and Extra Items

Sustainability Analysis- Water& Energy

Sustainability Analysis- Material& Labour Compliance

Conclusion