During my final-semester exchange at the Faculty of Architecture, Building and Planning, I completed three subjects applying Australian standards to real projects. For Risk in Construction, I built an ISO 31000 risk plan for a heritage demolition at 607-623 Collins Street, isolating façade collapse as the sole Extreme risk (approximately AUD 919k). For Means and Methods, I developed a Site Operations Management Plan for a $70M Moray Street tower, covering dual luffing cranes and phased steel erection. For AI in Construction, I examined two governed agentic tools, Total Recall and ClauseIQ.


Report Content

Three exchange subjects at Melbourne, each applying Australian standards to a real project.

ISO 31000 framework, context and 5×5 risk register for the Collins Street heritage demolition.

Bow-tie analysis of R1 façade collapse, mapping preventive barriers to mitigation controls.

Event tree quantifying R1 across eight scenarios to an approximate AUD 919k expected loss.

Traffic management plan and dual luffing crane load charts for the Moray Street tower.

Eight-stage tower crane erection sequence over two weekends with a 250T mobile assist.

Two off-site structural steel packages and the Phase 2 rooftop erection methodology.

Total Recall: point-of-placement recall screening in Revit with three-tier confidence routing.

ClauseIQ: agentic contract-variation screening governed under a four-layer ISO/IEC 42001 model.

Conclusion: recognised standards and structured method make high-consequence work defensible.