Behara Venkata Swetha Nandana

CM4001-1

High-Rise Commercial Tower

The studio outlines the Integrated Construction Practices (ICP) methodology followed in Semester 3, focusing on the integration of BIM and Lean Construction for a High-Rise Commercial Tower in GIFT City, Gandhinagar, Ahmedabad. The project includes 3 basements, a ground floor, and 29 floors above, with a total built-up area of 66,616 sq. m, featuring premium office spaces, showrooms, and retail facilities. During the studio, a stakeholder-driven framework was formulated, supported by comprehensive information requirements, a BIM Execution Plan, and a coordinated delivery schedule. Discipline-wise LOD 300-400 models were developed, enabling systematic clash detection and interdisciplinary coordination. Model-based quantity take-offs and BOQs were prepared, while site logistics were refined through 3D layout analysis. The workflow further incorporated 4D-5D simulations and Last Planner–based tracking to assess and improve overall time and cost performance.


Report Content

Project Brief

EIR & Challenges

BIM/ICP Proposed process flow map

Risk Analysis

Site Layout Optimization - Current Site layout

Plus Analysis

Site Layout Critique

Proposed Site Layout

POT Analysis

Conclusions

Project Video