SEMI HIGH SPEED RAIL PROJECT

A comprehensive feasibility study was undertaken for the 225 km Semi High-Speed Rail Corridor, envisioned to significantly reduce travel time between two major urban centres while improving regional connectivity. The corridor includes four intermediate stations at Sanand, Bavla, Limbdi, and Chotila, and its scope covers key civil and system-level works such as station development, alignment and track design, bridges and structures, signalling and telecommunication systems, and OHE installations essential for semi high-speed operations. Throughout the studio, the project was evaluated through a series of analytical assignments—from context and demand studies to design formulation, cost analysis, stakeholder and risk assessments, financial appraisal, and a sustainability proposal. Together, these components shaped a multidimensional feasibility framework assessing the project’s technical viability, economic rationale, and implementation considerations.


Report Content

Project Brief

Design Brief

Design Brief

Work Breakdown Structure

Work Breakdown Structure

Work Breakdown Structure

Cost Breakdown Structure

Cost Breakdown Structure

Cost Breakdown Structure

Project Conclusion

Project Video