The Integrated Construction Practices (ICP) studio examined how project information is created, shared and controlled on a high-rise residential and mixed-use development in Science City, Ahmedabad. Site visits, stakeholder meetings, a questionnaire survey, delay-register analysis and RFI review revealed recurring issues in design coordination, document control, Workfront readiness and delay monitoring. In response, an EIR, BEP, TIDPs and a MIDP were prepared, a Common Data Environment was trialled, and discipline models developed in Revit were coordinated in Navisworks for clash detection. Model-based quantity take-off (5D) was compared with manual take-off, and 4D simulation was explored to link the model with the construction sequence. The Last Planner System supported weekly planning and Workfront-readiness checks, while a sustainability comparison of materials and KPI dashboards supported decision-making and monitoring. The studio built a practical understanding of how BIM, structured information exchange and short-term planning can improve coordination and project control.