For a richer surfing experience on our website, please update your browser. Update my browser now!
The project is a premium high-rise residential development located in GIFT City, Gandhinagar, Gujarat, an area designated for high-rise residential use. It is built on a plot of 1.13 acres and comprises three towers (T1, T2 and T3) each rising to G+32 floors & three basements. The development provides a total of 262 residential units. The course applied BIM and digital construction practices to a live high-rise residential project, approached from the perspective of the Mechanical-Electrical Consultant and Contractor. The study began with a questionnaire survey of industry professionals to identify coordination gaps and propose project KPIs. Information requirements were then established through the EIR and BEP, including LOD responsibilities. Mechanical-Electrical modelling in Revit was followed by clash detection and resolution in Navisworks. Site simulation done using (POT tool) Path of travel which enhanced the overall site efficiency. Last Planner System (LPS) tool used for tracking activities over a week and derived PPC. Lean tools applied to improve the performance. The study concluded saying Integrated Construction Practice improves in planning, scheduling, faster decision making, coordination and reduce cost than conventional way.