Rithwik V Thilleri

CM4001

Riverside Mixed Use Development - GIFT City

The Integrated Construction Practices (ICP) studio focused on evaluating construction management practices for the Riverside Mixed Use Development at GIFT City, Gandhinagar. The scope was limited to Basement 1 and the Third Floor Typical of Tower A, selected to compare a constrained, service-heavy basement with a repetitive tower floor. The project provided an opportunity to examine how these contrasting zones demand different coordination, planning and control approaches. The studio involved ISO 19650-based information management through EIR, BEP, MIDP and TIDP, LOD and LOS definition, model quality checks, multidisciplinary clash detection, quantity take-off verified against manual calculations, blockwork productivity assessment, site logistics planning, and 4D and 5D simulation comparing planned and actual slab cycles and formwork options. Project challenges were identified through questionnaire surveys, Relative Importance Index analysis and challenge, delay and hindrance registers, highlighting recurring issues in drawing revisions, document control, information flow, coordination and responsibility allocation. A Common Data Environment with Work in Progress, Shared and Published workflows was proposed, along with an assessment of its cost, savings and payback. The Last Planner System, pull planning, RACI matrices and KPIs were applied to track commitments, constraints and progress. The studio developed a clear practical understanding of how digital information management and collaborative planning support predictable construction delivery and project control.The Integrated Construction Practices (ICP) studio focused on applying integrated construction management practices to the Riverside Mixed Use Development at GIFT City, Gandhinagar, Gujarat. The project provided an opportunity to examine how multidisciplinary project teams coordinate information, decisions and responsibilities across design and execution. The studio involved BIM-based workflows covering Exchange Information Requirements, BIM Execution Plans, LOD and LOS definition, federated BIM models, clash detection, quantity take-off, site optimisation and 4D and 5D simulation to evaluate construction sequencing, labour productivity and cost implications. Project challenges were analysed through questionnaire surveys, Relative Importance Index analysis and challenge, delay and hindrance registers, highlighting recurring issues in information flow, design coordination, documentation and responsibility allocation. A Common Data Environment was developed to manage revisions, approval workflows and communication among teams, along with naming conventions, status control and defined responsibilities. The Last Planner System and pull planning were used to track commitments and constraints, supported by RACI matrices and key performance indicators for monitoring coordination, delays and progress. A comparison with the traditional approach showed how ICP enables earlier issue resolution, clearer accountability, reliable information exchange and reduced rework. The studio developed a clear practical understanding of how BIM, digital information management and collaborative planning support predictable, efficient and transparent construction delivery and project control.


Report Content

Project Brief

Employer's Information Requirement

BIM Execution Plan

Bow-tie Analysis

Workflow

Visual Check

Clash Detection

Clash Detection

4D & 5D Simulation

Conclusion

Project Video