For a richer surfing experience on our website, please update your browser. Update my browser now!
The Integrated Construction Practices (ICP) studio focused on evaluating construction management practices for the Riverside Mixed Use Development at GIFT City, Gandhinagar. The scope was limited to Basement 1 and the Third Floor Typical of Tower A, selected to compare a constrained, service-heavy basement with a repetitive tower floor. The project provided an opportunity to examine how these contrasting zones demand different coordination, planning and control approaches. The studio involved ISO 19650-based information management through EIR, BEP, MIDP and TIDP, LOD and LOS definition, model quality checks, multidisciplinary clash detection, quantity take-off verified against manual calculations, blockwork productivity assessment, site logistics planning, and 4D and 5D simulation comparing planned and actual slab cycles and formwork options. Project challenges were identified through questionnaire surveys, Relative Importance Index analysis and challenge, delay and hindrance registers, highlighting recurring issues in drawing revisions, document control, information flow, coordination and responsibility allocation. A Common Data Environment with Work in Progress, Shared and Published workflows was proposed, along with an assessment of its cost, savings and payback. The Last Planner System, pull planning, RACI matrices and KPIs were applied to track commitments, constraints and progress. The studio developed a clear practical understanding of how digital information management and collaborative planning support predictable construction delivery and project control.