B Prem Chandran

BE4003

IDL and WBD I Monsoon Semester 2026

The project focuses on the energy performance optimisation of a 24-storey mixed-use commercial building in Kolkata, comprising retail spaces and office areas, located in kolkata . The study evaluates the building's energy consumption and thermal comfort through an integrated approach involving climate analysis, daylight optimisation, envelope performance, HVAC system optimisation and rooftop solar PV integration. Using DesignBuilder, EnergyPlus and One Click LCA, multiple simulation iterations were conducted to identify energy-efficient design strategies and assess their operational, economic and environmental impacts. The proposed design achieves a 34.7% reduction in Energy Performance Index (EPI), reduces unmet comfort hours from 206 to 50, and integrates a 161.7 kWp rooftop solar PV system. A 50-year life-cycle cost and carbon assessment further evaluates the long-term benefits of the proposed interventions.


Report Content

Project Introduction and Key outcomes

Climate and Natural Ventilation Potential

Envelope Optimization

Envelope Optimization - Runs (End use profile)

Daylighting Optimization

HVAC Optimization

HVAC Performance and Optimization

Renewable Energy Integration and Pay back

Cost Benefit Analysis

Life Cycle Assessment