Sutaria Srushti Dharmesh Sonali

BE4003

IDL & WBD Lab | Monsoon Semester 2026

This project explores whole-building energy optimisation of a G+21 mixed-use commercial tower in Amritsar’s composite climate. Through climate analysis and dynamic simulation, passive envelope interventions, including improved insulation, low-E glazing and orientation-specific shading, enhanced thermal performance while improving useful daylight distribution from 56.7% to 82.2%. Integrated HVAC strategies, such as chiller right-sizing, demand-controlled ventilation and heat recovery, reduced the building EPI from 149.58 to 82.84 kWh/m²·yr. Comparative analysis of thermal storage, radiant cooling and solar PV further informed the final design selection. The project strengthened my understanding of simulation-led design, energy–comfort trade-offs and lifecycle cost optimisation.


Report Content

Introduction and Climate Analysis

Standard Case Load Analysis

Envelope and Daylight Optimization

HVAC Optimization : Energy- Comfort Trade - offs

HVAC Optimization: PLR, Heat Rejection & Cost Trade-off

HVAC Optimization: Ventilation Heat Recovery Impact

Renewable Energy

Cost Analysis

Life Cycle Assessment (LCA)

Final Evaluation