Amruta Varshini S

BE4003

MONSOON SEMESTER 2026 | IDL AND WBD

This project assesses the energy performance of a G+21 floor commercial building in Chennai’s warm-humid climate. Climate analysis, daylight simulations and energy modelling inform an integrated approach to reducing cooling demand and enhancing occupant comfort. Key interventions include orientation-specific façade shading, envelope optimization, daylight improvement, energy-efficient lighting and HVAC optimization through high-efficiency VSD fans, energy recovery wheels, demand-controlled ventilation and optimized chiller sequencing. A 74.25 kWp rooftop solar PV system and life-cycle assessment further address renewable energy integration and embodied carbon. Collectively, these measures reduce EPI from the ECSBC baseline of 116 to 77.48 kWh/m².year, achieving 33.21% annual electricity savings.


Report Content

Building And Climate Overview

Standard Case - Load Analysis

Daylight And Shading Optimization

Envelope And Interior Lighting Optimization

HVAC Optimization_ECMs

HVAC Optimization_ECMs

HVAC Optimization_ECMs

Renewable Energy Integration And LCA

Cost Benefit Analysis

Overall Summary Of Proposed Case