Nathulal Suthar

BE4003

Monsoon Semester 2026 | IDL & WBD Studio

This whole-building energy optimization study for Pragya 2,a 41,636 m² Class A commercial office in Bhopal’s composite climate—demonstrates a passive-first methodology to achieve Super ECSBC compliance. By deploying orientation-specific GFRC facade shading and NBC-calibrated LED lighting, peak solar and internal loads dropped substantially, boosting daylight autonomy (UDI-a) to 81.6% and downsizing the chiller plant from 1,294 TR to 990 TR. Subsequent mechanical optimizations—asymmetric chiller sequencing, wet-bulb condenser reset, CO-sensor parking DCV, and 0.15 VAV turndown—paired with a 199.52 kWp bifacial solar array cut MEPI by 48.6% (138.00 to 70.88 kWh/m²·yr), delivering Grade A embodied carbon and 2.26 Cr annual savings.


Report Content

Project Details & Climate - Project Brief | Model Geometry | Climate

Climate Analysis - Passive Design Strategies – Potential & Implementation

ECSBC Standard Case - Load Profile & HVAC Baseline

ECSBC Standard Case - Annual End Use & Unmet Hours Analysis

Daylight & Shading Design - Envelope & Illuminance Optimization

Artificial Lighting & Parking Ventilation - LPD Reduction | DCV Parking Fans | CO Sensors

HVAC Optimisation - Chiller Sequencing | CHW & Condenser Water Reset | VAV Turndown Ratio

Renewable Energy Integration - Solar PV | Shadow Analysis | Performance Optimisation

Life Cycle Assessment - Embodied Carbon | Cost Calculations | Value Engineering

Whole Building Summary - Project Trajectory | ECM Summary | Super ECSBC Compliance