The project focuses on Hyatt Place Bharuch, located in Gujarat, an upscale business hotel designed to support corporate guests with 148 rooms and extensive banquet facilities. The studio focuses on understanding and integrating Mechanical, Electrical, Plumbing, and Fire Protection systems through technical design, load calculations, and spatial planning. Through this project, centralized HVAC, water supply, electrical distribution, and fire-safety grids were explored, emphasizing equipment selection, system sizing, service routing, and multidisciplinary coordination to develop efficient and integrated building services.

View Additional Work

Report Content

This slide establishes the foundational parameters for the Hyatt Place Bharuch project. It outlines the core architectural and environmental context—including functional zoning, site climate data, and baseline floor plans—which serves as the fundamental basis for all subsequent MEPF engineering design and coordination.

This slide details the core water calculations and MEP strategy for the Hyatt Place Bharuch project. It showcases the technical process of translating building population into daily water demand, accurately sizing underground storage tanks, and mapping out clear distribution flowcharts for both domestic water and fire safety.

This slide illustrates the spatial planning and technical drafting for the building's plumbing system. It demonstrates the systematic identification of wet spaces and required fixtures across all floor levels, accompanied by detailed floor plans for water supply, sanitary drainage, and stormwater management.

This slide outlines the comprehensive electrical load estimation and equipment strategy for the hotel. It breaks down the methodology for calculating power requirements across guest rooms, common areas, and dedicated HVAC plant, presenting floor-wise load distribution and detailed schedules for both high-power machinery and ELV systems.

This slide translates the estimated electrical loads into concrete equipment sizing for the transformer and backup generators. It features a consolidated load schedule alongside detailed lighting and power drawings across multiple floors, demonstrating how the electrical distribution is physically routed and managed throughout the hotel site.

This slide presents the design basis and hydraulic calculations for the hotel's fire safety infrastructure. It details code compliance and technical specifications for fire-water demand, storage capacity, and pump sizing, alongside a drafted basement layout of the pump room and sprinkler grid.

This slide illustrates the spatial implementation of the fire safety strategy across various levels of the building. It features a comprehensive matrix detailing specific safety provisions for different space types, alongside drafted floor plans that map out the physical fire network for key areas such as the lobby, banquets, and typical guest floors.

This slide outlines the engineering rationale behind the hotel's climate control strategy. It details the progression from environmental analysis and building envelope metrics to calculating internal heat gains and total plant load. Additionally, it features a comparative matrix that justifies the final selection and sizing of a centralized chilled-water system.

This slide details the mechanical specifications for the hotel's centralized climate control. It covers the technical parameters of the chilled-water plant and breaks down the equipment schedules for air handling units, ventilation, and exhaust. Additionally, it maps out the sizing criteria for piping and ductwork alongside the system's total electrical load requirements.

This slide demonstrates the physical integration of the HVAC system within the hotel's architecture. It features detailed floor plans, ceiling section diagrams, and riser schematics, highlighting the careful spatial coordination required to route and conceal ducts, pipes, and equipment within false ceilings and designated utility shafts.