Mann Sharma

CT3009

Embrace The Wind | Integrated MEPF Design

An integrated MEPF design study for a five-tower mixed-use residential and commercial development. The project brings together Plumbing and Sanitation, Fire Protection, HVAC and Electrical systems through demand calculations, equipment sizing, technical layouts and service distribution planning. It also explores BIM-based modelling and coordination using Revit and Navisworks, including clash detection and the integration of building services with the architectural and structural design.


Report Content

Project Introduction

Plumbing Design

Plumbing Design

Electrical Design

Electrical Design

Fire System Design

Fire System Design

HVAC System Design

HVAC Design System

BIM Implementation