SD4013-1

DOUBLE CONVEYOR GALLERY

This project covers the analysis, design and detailing of a 100 m long double conveyor gallery that carries coal between two transfer towers at Ankleshwar. The 7.8 m wide, 3 m deep gallery spans 25 m between three steel trestles, TR1 to TR3, which are 23.5 m, 28.7 m and 33.9 m tall. Only open steel sections are used, and the design is checked for a basic wind speed of 39 m/s. 2D portal-frame and truss iterations are compared on steel weight and deflection, and the best option is carried into a 3D STAAD model. The work also covers bracing, the trestles, the critical junction connection and the base plates, with all deflections kept within limits