For a richer surfing experience on our website, please update your browser. Update my browser now!
The main project is a single-gallery steel conveyor structure for a coal handling plant. The 100 m long gallery is supported on 2-legged and 4-legged trestles. The work covers load calculations (dead, live, wind and seismic), a comparison of portal and truss frames, analysis and design of the gallery and trestles, member and connection design and a steel take-off comparison with other trestle spacings.
The portfolio also includes the design of a 95 m tall RCC chimney in Cochin, covering wind and seismic analysis, temperature effects of the flue gas and deflection checks.