• Home
  • FT
  • SD4010
  • STRENGTHENING OF OLD SARDAR PATEL BRIDGE, GUJARAT

Jariwala Shubh Pareshkumar

SD4010

STRENGTHENING OF OLD SARDAR PATEL BRIDGE, GUJARAT

Old Sardar Patel bridge over Sabarmati river underwent a comprehensive structural assessment (Gravity Load, Moving Load and Seismic Load) and strengthening project. Old Sardar Patel bridge was built in 1939 and later on it was expand in 2000 from one lane to two lane. But this studio project was mainly focus on old bridge. Pushover analysis of 87-year-old RCC bridge was done for gravity load, moving load and seismic load and verifying with relevant code such as for loading IRC 06 – 1966 & 2017, for design IRC 21 – 1987 (PCC & RCC), IRC 112 – 2020, for seismic load IRC SP 114 – 2018. After verification with relevant code as mansions earlier, we have to identify that is structure need to do strengthen or to repair and to suggest preventive measures to reduce damage due to corrosion, effloresces, seepage and moisture etc. and to check performance structure after application of strengthening proposal to existing structure globally as well as locally. For this project i have done pushover analysis of super structure as well as for pier also. In which, strengthening of super structure need to be required but strengthening of pier is not required.


Report Content

GENERAL ARRANGEMENT & PROJECT DETAILS

DAMAGE MAPPING

LOAD COSIDERATION & APPLICATION

GRILLAGE ANALYSIS, STATIC CHECKS & DETAILING

DECK SLAB ANALYSIS, DESIGN AND DETAILING

PUSHOVER ANALYSIS OF GIRDER

DESIGN AND DETAILING OF PIER AND PIER CAP

PUSHOVER ANALYSIS OF PIER WITH PIER CAP

STRENGTHENING OF GIRDER

GENERAL STRENGTHENING, REFERENCES AND CONCLUSIONS