Engineering Road : Design and Development Drive

This project focuses on designing an 11.93 km Major District Road between Samakhiyali and Gandhidham using a terrain-responsive engineering approach. The work includes detailed GIS-based site assessment topography, drainage, LULC and soil analysis followed by the development and evaluation of four alignment alternatives. The final alignment was selected for its geometric efficiency, industrial connectivity and minimal environmental impact. Complete geometric design was carried out as per IRC standards, including horizontal and vertical alignment, cross sections, drainage design and pavement composition for 4.63 msa traffic. Road safety planning and preliminary cost estimation together form a comprehensive, technically feasible MDR proposal.


Report Content

Project introduction explaining the industrial importance of the Samakhiyali–Gandhidham corridor, studio learning objectives, and the step-wise methodological approach adopted for alignment design.

Site introduction highlighting the Samakhiyali–Gandhidham corridor, existing terrain conditions, purpose of proposing a new MDR route, and limitations of current connectivity for the salt-industry region

Study area delineation from national to local scale and soil map indicating predominant loamy soil, which influences drainage, pavement design, and subgrade engineering decisions.

Geospatial analysis showcasing Land-Use–Land-Cover distribution, contour variation, and Strahler stream order classification used to understand terrain, drainage, and environmental constraints.

Identification of obligatory points such as salt-pan zones and tributary crossings along with four design iterations examined to achieve optimal route selection considering safety and land constraints.

Horizontal alignment explanation integrating terrain characteristics, curve design as per IRC:73-2018, and optimization to balance safety, sight distance, and smooth vehicular movement.

Vertical alignment justification describing extraction of ground levels, gradient selection as per IRC:73-2018, introduction of summit and valley curves, and optimization for drainage and riding comfort.

Drainage design sheet showing catchment delineation, trapezoidal RCC side drain dimensions, and recommended cross-drainage structures including Hume pipe culverts and slab culverts at critical locations.

Mass Haul Diagram representing earthwork quantities along the alignment. Includes area and volume calculations, cut–fill variation, and cumulative mass curve used to plan efficient earthwork management. Detailed representation of horizontal geometry overlaid with mandatory safety signages. Chevron signs and curve warnings are placed as per IRC guidelines to ensure safe vehicular movement on curves.

Comprehensive General Alignment Drawing showing both the horizontal and vertical profiles of the proposed MDR. The sheet includes key map, curve radii table, general notes, and graphical representation of alignment geometry for clear understanding of the route design.