Anshu Mehta

CT2036

Puratattva Marg

The project focuses on designing a roadway alignment through the archaeological site of Dholavira to improve accessibility while preserving its historical, cultural, and environmental significance. It involves analyzing the terrain, understanding the site layout, studying visitor flow, and selecting a route that enhances interpretation without affecting sensitive archaeological areas. The design incorporates key geometric elements, proper drainage planning, essential signages, and visitor-oriented features to ensure safety and comfort. Overall, the project aims to create a well-planned, sustainable route that strengthens connectivity, supports tourism, and provides an informative and comfortable experience, all while maintaining minimal environmental impact and protecting the integrity of the Dholavira site.

View Additional Work

Report Content

Studio brief and cycle track journey, evolving from concept to aligned design.

Cycle track final General alignment drawing. (Horizontal and Vertical drawing).

About Dholavira and its socio economic factors.

Contour, strahler, LULC and soil map.

Purpose for designing the road and iterations.

Final Horizontal Alignment Depicting the Selected Route through Dholavira.

Final Vertical Alignment Showing Existing and Proposed Road Profiles.

Cross section, pavement material and its thickness.

Drainage, cost and mass haul diagram.

Road safety plan.