For a richer surfing experience on our website, please update your browser. Update my browser now!
This project plans and designs a greenfield road connecting Ahwa and Chankhal in Dang District, Gujarat, through hilly, forested terrain. The objectives are to reduce travel time, improve rural connectivity and promote tourism while limiting environmental impact. The study covers terrain assessment, comparison of three route alternatives, and a 7.81 km alignment with geometric, pavement, drainage and road safety design as per IRC standards. A machine-learning optimised route was also generated and compared against the proposed alignment, along with earthwork, slope protection and a preliminary cost estimate of ?31.90 crore.