This project plans and designs a route between Chikhali and Chinchod in the Dang district of Gujarat, running through hilly, forested terrain. The road is 13.15 km long, against 21.9 km on the existing route. Its aims are to cut travel time, strengthen regional connectivity and support tourism, while keeping the impact on the environment low. The work starts with terrain assessment and quantitative analysis, then develops the corridor through four route options, from which one final route is chosen. The final route is then designed in detail, covering geometric alignment, pavement, drainage and road safety based on IRC standards. The project also includes an optimisation algorithm that generates and compares road alignments using several terrain and spatial datasets, so it can find suitable routes in different types of terrain.

View Additional Work

Report Content

Chikhali to Chinchod in The Dangs, Gujarat, with 12 villages and 7,988 people, with an existing route of 21.9 km.

Land use, contour and slope maps show hilly, forested ground and a river valley. Route 4 has the lowest elevation gain (393 m) and loss (251 m), and the gentlest average slope (9.1 %).

Four routes were scored based on seven criterias. Route 4 scored highest (3.86) and became the 13.15 km final route.

The 13.15 km road has 30 horizontal curves and 8 vertical curves, with a steepest gradient of 1 in 31. It shows the horizontal profile, the general alignment drawing and the vertical profile.

Cross sections at every 880 m interval. The deepest cut is 81.7 m and the highest fill is 36.5 m.

16 catchments were marked along the road. RCC-lined trapezoidal side drains, 1200 mm pipe culverts at the streams and one at bridge.

Road Safety

Soil and material tests, a subgrade CBR of 5 % and design traffic of 5.92 msa give a 570 mm pavement thickness. An interpretation of using sustainable materials like waste plastic, steel slag and demolition waste.

About 85 % of the route needs protection from deep cuts (up to 81.7 m) and high fills (up to 36.5 m).

The Optimized route showed 18.2 km long with 10 curves and 12 to 14 river crossings., so the proposed route 13.15 km is more convenient, followed by the SWOT analysis.