Priyansh Singh

CT2036

Roadway Planning and Design: Girmal to Subir

This project focuses on planning and designing a greenfield road connecting Girmal and Subir villages in Dang District, Gujarat, through a hilly, forested terrain. The primary objectives are to reduce travel time, improve regional connectivity and promote tourism while minimizing environmental impact. The study involves terrain assessment, quantitative data analysis and iterative corridor development, followed by geometric alignment, pavement, drainage and road safety design in accordance with IRC standards. Additionally, an optimization algorithm has been developed to generate and evaluate road alignments using multiple terrain and spatial datasets, identifying suitable routes across diverse geographical regions.

View Additional Work

Report Content

In the initial phase, the study area around the villages was identified by performing Desktop reconnaissance. The existing features, landmarks and important locations were marked to create the initial base map of the region. The site's elevation, rainfall data, rivers were studied as well. The existing 20.1 km route connecting the two villages was also identified and based on this assessment, the need for a new route was identified which was to make the route shorter, better connected cutting travel time and boosting tourism.

Terrain study was carried out using Land use, contours, slope, aspect, roughness and stream order. These layers were then used to mark the valley corridors, points where water crossings would be needed, with the six iterations laid onto them.

On the basis of the terrain study, six alignments were proposed and then compared on route parameters and a 1-5 suitability scoring. Route 5 scored the highest with the most suitable average slope and no water crossings, so it was selected as the final route. The total trip of 11.8 km compares with 20.1 kms on the existing road.

The geometric design of the selected route was developed, starting with the horizontal alignment of 23 curves along the terrain contours. The design parameters were adopted from IRC:73-2023 for an Other District Road in rolling terrain, with a 40 km/h design speed, a 7 m carriageway and a 25 m right of way. The alignment was validated against GeoSadak data and crosses no existing road.

The vertical alignment was prepared along the centreline, with cut and fill balanced to avoid excess or shortage of material. Where cuts and fills were high, slope stabilisation was provided: an 8.5 m RCC cantilever breast wall on the hill side and a 3.5 m RR masonry wall on the valley side, with 1H:1V cut slopes above.

Cross sections were drawn from CH 0+000 to CH 11+570 to calculate earthwork. The mass haul diagram shows 4.82 lakh m³ of cut against 6.22 lakh m³ of fill (with 30% extra), a shortage of 1.4 lakh m³ to be met from nearby borrow areas. Laboratory tests on soil, aggregate and bitumen confirmed a clayey sand subgrade (soaked CBR 5.4%) and materials within IS limits.

Using these soil and material results, the pavement was designed as per IRC:37-2018. The initial 940 mm section was upgraded to a 1040 mm section with a cement-treated base, a WMM crack-relief interlayer, plastic-modified DBM and steel-slag bituminous concrete. It uses local materials and hill-cut soil for about 7% more cost, giving a stronger, longer-lasting pavement.

With the pavement fixed, drainage was designed by identifying 106 catchments to size each drain. Unlined earthen trapezoidal side drains (0.30 × 0.70 m) were designed for peak discharges of 0.09-1.62 m³/s. 13 pipe culverts with headwalls and catch pits were placed for cross drainage.

Road safety was made through a signs and markings plan, and the start junction was realigned to meet SH-80 at 90°. The manual design (11.6 km) was then checked against the optimizer's Path R01 (10.43 km, 10% shorter, but 2.8 times more fill). A SWOT analysis summarised the project's strengths, weaknesses, opportunities and threats.

To automate the corridor selection used in this design, a Road Alignment Optimizer was developed. It reads a DEM, learns where roads are normally built, prices every 30 m cell and searches the least-cost path at the design gradient. It returns three ranked, IRC-checked routes, and on Subir-Girmal it recommended R01 (10.43 km). The slide also lists its limits, as the engineer's survey and detailed design are still required.