Shah Kenil Prashant

CT2036

Terrain-Responsive Road Infrastructure Planning & Design

The project focuses on planning and designing an all-weather village road connecting remote and low-density settlements between Chinchod and Waghai in the Dang district of Gujarat. The primary objective is to improve rural connectivity and provide better access to essential services, agricultural markets, healthcare and education. The study involves analysing the region's topography, contours, slope, drainage networks and land use to identify a suitable road alignment while minimising environmental impact and excessive earthwork. Four alternative routes were evaluated, and Route C (18 km) was selected based on its overall suitability, settlement connectivity and terrain conditions. The selected alignment was further developed through horizontal and vertical curve design, earthwork calculations, soil and material testing, pavement design, drainage and culvert planning, slope protection and road safety measures, following relevant IRC guidelines. Overall, the project aims to develop a safe, economical and terrain-responsive road infrastructure that improves accessibility for remote rural communities while considering the region's environmental and geographical constraints.


Report Content

The project aims to develop an all-weather road connecting remote settlements between Chinchod and Waghai, improving accessibility in the hilly terrain of Dang district.

Contours, slope, aspect, land use and drainage networks were analysed to understand the terrain and identify suitable areas for road alignment while minimising environmental impact.

Four alternative routes were evaluated based on terrain, slope, land use, water crossings and earthwork. Route C, with an 18 km length, was selected for its overall suitability and settlement connectivity.

The selected route was designed with 17 horizontal curves, considering design speed, minimum radius, superelevation, extra widening and sight distance as per IRC guidelines.

The vertical alignment was developed using existing ground levels, gradients and vertical curves. Cut and fill calculations were performed to estimate the earthwork requirements and surplus soil.

Soil, aggregate and VG-40 bitumen tests were conducted to evaluate material properties. The soaked CBR of 5.4% was used to establish a design subgrade CBR of 5%.

Fifteen road cross-sections were prepared at different chainages to understand the existing ground profile, proposed formation levels and cutting and filling requirements.

Twenty catchments were delineated, and runoff calculations were carried out to design side drains and identify suitable culvert locations for effective stormwater management.

A 495 mm pavement crust was designed based on traffic and subgrade conditions. Slope protection measures, warning signs and intersection safety arrangements were also proposed.

The proposed alignment was evaluated through SWOT analysis and compared with an optimised route to understand differences in elevation, earthwork requirements and construction economy.