Akshit Tejas Shah

CT2036

THE EMERALD LINK

The project involves planning and designing a proposed road connecting Subir to Pilpalaidevi, with the aim of improving connectivity and supporting tourism development in the region. The work began with studying the existing terrain and developing multiple possible road alignments. These routes were then compared to identify the most suitable option for the proposed road. The project also covers drainage and pavement design, slope stabilisation, road safety, and cost estimation to ensure that the proposed road is safe, practical, and suitable for the area.


Report Content

An overview of the study area, highlighting its geographical context, existing road conditions, and surrounding landscape through maps and site observations.

Planning a road alignment includes researching land usage, geography, and drainage to compare route possibilities and finalizing the preferred alignment and design specifications.

Proposed road alignment demonstrates the route, curve geometry, chainage, and design calculations for safe and smooth travel.

Road elevation analysis highlights summit and valley curves, grade variations, and the calculations needed for an even road design.

Analysis of road cross-sections, earthwork quantities, and soil conditions along the proposed alignment.

Drainage and pavement design analysis for effective water management and suitable road construction materials.

Road safety measures and slope stabilisation designs to ensure safer roads and stable slopes along the proposed alignment.

Detailed cost estimation covering earthwork, pavement, drainage, slope protection, and road safety components of the proposed road.