Udeshi Tanvi Rajesh Rupa

UH4002

Enabling Brownfield Development

This project examines brownfield redevelopment through the lens of underutilised transit assets in Ahmedabad, focusing on bus terminals and railway stations. The study analyses existing redevelopment models, identifies institutional and financial gaps, and evaluates how transit-oriented, mixed-use development can unlock land value while improving infrastructure efficiency. The objective is to create integrated multimodal hubs that enhance accessibility, strengthen commercial viability, support inclusive densification, and improve long-term urban and transport performance.


Report Content

Genealogy of Urban Interventions

Brownfield redevelopment sites in Ahmedabad and highlight the growing demand-capacity gap in Ahmedabad’s transit asset

The Ranip Bus Terminal case reveals how upfront revenue models can weaken long-term asset performance

Case study learnings emphasise the need for occupancy-driven and demand-responsive redevelopment models

Future MMTH sites are prioritised based on land value, transit demand, and network importance.

Asset 2: Railway Station Redevelopment: Positioning transit hubs as engines of urban transformation.

Strategic station redevelopment sites are identified through connectivity, demand, and commercial viability analysis

Maninagar emerges as the strongest redevelopment candidate due to its network strength and stable commercial demand

Proposal for a Pilot Stretch with strong TOD potential for future mixed-use redevelopment under Urban Challenge Fund