• Home
  • FT
  • SD4005
  • PRETENSION U-GIRDER WITH RECT. PIER & OPEN FOUNDATION

Bhavsar Krishna Jayeshkumar

SD4005

PRETENSION U-GIRDER WITH RECT. PIER & OPEN FOUNDATION

This project presents the structural design of a 30 m span precast pretensioned U-Girder bridge proposed in Jaipur, featuring rectangular piers supported on open foundations. The bridge was designed considering the site conditions, including Seismic Zone II and significant wind effects, to ensure safety and durability. Structural analysis was carried out using grillage modeling in STAAD.Pro, with consideration of different construction stages and load combinations. The study involved the design and verification of girder flexure, shear resistance, prestressing force requirements, strand arrangement, and stress checks under various loading conditions. Additional evaluations included temperature effects, seismic forces, wind loads, and braking forces. The substructure components such as pier cap, pier, and footing were also designed and checked for stability, serviceability, confinement, and slenderness requirements. The final outcome is an optimized and reliable bridge system satisfying modern bridge design standards and project-specific functional requirements. 

View Additional Work

Report Content

BASIC DATA

LOAD CONSIDERATION

GRILLAGE ANALYSIS

LOSS CALCULATIONS

GIRDER & DIAPHRAGM DESIGN

DECK SLAB DESIGN

ANALYSIS AND DESIGN OF PIER CAP AND PIER

ANALYSIS AND DESIGN OF OPEN FOUNDATION

SUPERSTRUCTURE DETAILING

SUBSTRUCTURE DETAILING