Shah Sahil Jigarkumar

CM4050

PCM24505

This research develops a BIM-integrated workflow that automates construction progress monitoring using Artificial Intelligence. The study addresses a critical industry gap where BIM models, construction schedules, and site progress reports exist as disconnected systems, causing inefficiencies in 4D project control. A structured five-stage Large Language Model prompt chain was developed to generate BIM-aligned baseline schedules directly from element work packages, eliminating manual schedule re-breakdown. Weekly site photographs and 360-degree walkthroughs serve as evidence inputs, enabling automated planned versus actual comparisons with deviation detection. Validated on a live residential high-rise structural pilot, the framework achieved 79% effort reduction and 100% BIM-to-schedule linking accuracy.


Report Content

Project Description & Research Brief

Research Gaps & Objectives

Site Input Scenario Analysis-Evidence Method Selection

Framework Architecture-Three Inputs, One Output (10 Modules)

BIM Naming Convention & Five-Stage LLM Prompt Chain

Case Study Application-The , Ahmedabad (2nd Floor)

AI Execution & Linking Results-Three Platforms Compared

Validation-4D Readiness · Image Analysis · Stakeholder Survey

Effort Reduction & Key Performance Metrics

Conclusions & Contributions to Knowledge