Premshankar Upadhyay Shambhusharan

CM4050

PCM24275

This research evaluates the performance of conventional and modern formwork systems in residential multi-storied RCC buildings by comparing their impact on construction time, project cost, and construction quality. The study analyses conventional timber/plywood formwork against modern aluminium and modular systems through a literature review, RII analysis, and three case studies with varying building heights. Results show that repetition capability and slab cycle time are the major decision-driving factors influencing lifecycle cost and project efficiency. An MCDM-based decision framework was developed to support engineers and contractors in selecting suitable formwork systems based on project scale, potential for repetition, quality requirements, and economic feasibility.


Report Content

INTRODUCTION

Aim, Objectives & Research Gap

Key Findings & Time–Cost–Quality Interrelationship

Data Sources, Methods & Case Study Scope

Relative Importance Index (RII) Results

50m Building & 60–80m Building

>90m High-Rise Building | Area: 196,747 m²

Time, Cost & Quality Comparative Analysis

MCDM Decision Support Framework for Formwork Selection

Conclusions & Recommendations

Project Video