VSM for slab cycle monitoring and reducing time of slab cycle
The slab cycle is one of the most critical and repetitive operations in building construction,
directly influencing project timelines, resource utilization, and overall productivity. A typical
slab cycle includes sequential activities such as formwork erection, reinforcement placement,
MEP embedment, and concreting, each requiring coordination between multiple teams and
resources. Despite its repetitive nature, the slab cycle often suffers from inefficiencies such as
waiting time, unbalanced labour allocation, poor material flow, dependency on shared
equipment, and rework due to improper sequencing or communication gaps.
To address these challenges, Value Stream Mapping (VSM) is applied as a lean construction
tool to visualize the entire workflow of the slab cycle from start to finish. VSM helps identify
value-adding and non-value-adding activities, quantify process delays, and highlight
bottlenecks that impact the cycle duration. By mapping the current state and designing a more
efficient future state, VSM provides insights into improving labour productivity, enhancing
material readiness, optimizing equipment usage, and standardizing processes. Ultimately, the
2
goal is to reduce waste, streamline operations, and achieve a shorter, more predictable slab
cycle, contributing to improved project performance and timely completion.