Delays in construction projects are commonly linked to issues such as material shortage,
equipment breakdown, or poor planning. However, the impact of human behavior and on-site
work practices is often overlooked. Labour productivity plays a major role in project
performance, and small inefficiencies at the work-front can lead to significant time and cost
overruns. One effective method to understand these inefficiencies is the Foreman Delay
Survey (FDS), a lean construction tool used to identify and analyse delays directly from the
workers’ perspective.
Although FDS has been successfully applied in several international projects, its use in the
Indian construction industry is still limited. This research focuses on applying the Foreman
Delay Survey to a micro-level construction activity in order to study the nature of human-
related delays. The study also considers factors such as type of activity, working conditions,
time of observation, and crew structure. By identifying both recoverable and supportive
delays, the research aims to suggest practical improvements. The study further attempts to
introduce lean thinking at the labour level while ensuring that workers’ basic needs and
working environment are respected.