Ayushmaan Singh Sirola

CM4050

PCM24061

DESIGN MANAGEMENTINTEGRATION WITH PRODUCTION MANAGEMENT.     Construction projects fail at one specific moment — when a design decision becomes an irreversible production commitment, with no formal mechanism governing that transition. This research developed Stabrix, a Design Production Intelligence Platform, introducing the Design Production Readiness Index (DPRI): a quantitative mechanism in construction management that makes design readiness measurable and governable. The DPRI scores five parameters across 25 sub-parameters, producing an auditable readiness score before any production task is committed. Validated through expert practitioner evaluation, the platform integrates design management with production management through a 3-layer architecture, preserving existing industry-standard tools while adding the governance layer they collectively lack.


Report Content

The Problem: Two Operating Logics & Literature Gaps

Seven Structural Contradictions & The Systemic Failure Loop

Research Aim, Objectives & Data Collection Framework

Expert Validation & Research Methodology

The Three Solutions & DPRI Integration Logic

DPRI: Gate Logic, Formula & Parameters

WBS–DWP–BIM Integration Architecture

The Stabrix Platform: 3-Layer Architecture & Expert Evaluation Results

Six Key Findings & The Research Contribution

Limitations, Future Scope & Conclusion