Vishal Kumar Pandey

CM4050

PCM22400

This DRP aims to study the process through which the railway station redevelopment project is Procured. The research seeks to investigate the Engineering, Procurement, and Construction (EPC) procurement model utilized for the redevelopment of railway stations. It aims to evaluate the rationale behind selecting this procurement model by a careful study of various documents and by other means. 


Report Content

Introduction

Literature Review

Literature Review

Data Collection

Data Collection

Case Study

Reference Project

Data Analysis

Data Analysis

Conclusion

Project Video