Mass concreting in deep infrastructure demands precise thermal and logistical control to prevent catastrophic cracking and cold joints. Existing standards often lack integrated guidance for fast-tracked, congested urban environments. This study aims to optimize the Time-Cost-Quality (TCQ) trade-off by developing a Thermo-Logistical Synchronization Strategy (TLSS). The objective is to establish a risk-calibrated planning model that synchronizes multi-plant RMC supply with active thermal management. Bounded by a 3.5m raft foundation case study in Halol, Gujarat, this research delivers a practical, cost-effective framework to safely execute massive continuous concrete pours in extreme semi-arid climates.