Sumit Chakarwarty

CM4050

PCM24397

This project focuses on improving coordination and communication in prefabricated construction through the integration of Social Network Analysis (SNA) and Building Information Modelling (BIM). The research analyses stakeholder interaction patterns in Pre-Engineered Building (PEB), precast, and composite construction systems to identify communication bottlenecks and coordination risks during design changes. Based on the findings, a mobile-based BIM framework with role-based access, real-time change tracking, and structured workflows is proposed and validated through a web-based prototype to enhance coordination efficiency and reduce project delays.


Report Content

Introduction & Role of BIM in Prefabrication

Aim, Objectives, Scope & Problem Statement

Literature: SNA Foundations & Design-Change Workflow

Workflow Time-Savings & Risk Identification

Empirical Hypotheses & Stakeholder Identification

Methodology — Questionnaire, Network Boundary & SNA Prep

Three Case Studies — Project Overviews & Design-Change Scenarios

SNA Results · Cross-Case Comparison · Hypothesis Testing

Key Findings ? BIM Integration ? Mobile Framework & RBAC

Conclusion

Project Video