Delays in construction projects are commonly linked to issues such as material shortage, equipment breakdown, or poor planning. However, the impact of human behaviour and on-site work practices is often overlooked. Labour productivity plays a major role in project performance, and small inefficiencies at the work-front can lead to significant time and cost overruns. One effective method to understand these inefficiencies is the Foreman Delay Survey (FDS), a lean construction tool used to identify and analyse delays directly from the workers’ perspective. Although FDS has been successfully applied in several international projects, its use in the Indian construction industry is still limited. This research focuses on applying the Foreman Delay Survey to a micro-level construction activity in order to study the nature of human-related delays. The study also considers factors such as type of activity, working conditions, time of observation, and crew structure. By identifying both recoverable and supportive delays, the research aims to suggest practical improvements. The study further attempts to introduce lean thinking at the labour level while ensuring that workers’ basic needs and working environment are respected.