This study investigates labour productivity in high-rise construction using Work Sampling methodology. Conducted at a 30-floor mixed-use development in Ahmedabad, the study observed five core RCC structural activities concreting, column reinforcement, shuttering, and beam and slab reinforcement across three consecutive floor cycles from February to March 2026. Activities were classified into Value-Added, Necessary Non-Value-Added, and Non-Value-Added categories to calculate Labour Utilization Rates (LUR) and labour productivity. Findings were validated through surveys with site professionals. The study proposes a management framework addressing RMC scheduling, equipment reliability, 5S workplace practices, and worker welfare to eliminate lean waste and improve vertical construction efficiency.


Report Content

Introduction

Area and Activity selection

Period of observation through Work sampling

Activity categorization

Activity categorization

Activity categorization

Activity Analysis

Factors affecting labour productivity

Data Analysis- Survey

Conclusion

Project Video