This semester was focused on learning the manufacturing and mass production techniques, considerations and limitations. As such, the intent was to prototype all 3 design projects. However, due to the global pandemic, we had to settle in for a digital only approach. The Kinetic facade is detailed for all of it's component drawings, assembly process, manufacturing techniques, and quantities for 100,000 pcs. The other two projects served as a learning ground for material manipulation and the challenges faced in prototyping, testing and redesigning.