• Home
  • FP
  • UR2036
  • Monument Precinct Development: Working Details

Keertana Jayraj Bhatt

UR2036

Monument Precinct Development: Working Details

The semester began with a focus on understanding the practicalities of construction, grounded in the research and analysis of live case studies. This foundational phase established a "lens of detail," which I then applied to my Spring ’25 project "Courtyards of Rememberance". 
Moving beyond the initial concept, the monument precinct was re-designed to ensure 100% wheelchair accessibility, proving that heritage spaces can be universally inclusive. The final output is a comprehensive set of working drawings that translates the earlier research into a technically resolved project ready for implementation.

View Additional Work

Report Content

Hand sketches made to understand technical details of floor systems. Drawings made for the Toilets were traced and annotated in AutoCAD to understand standard dimensions used. (Full compilation available in the group booklet).

Studying Urban Elements: Parimal Garden

Studying Urban Elements: Riverfront Flower Park

Site Plans

Working Details of Central Staircase and Planter

Working Details of Pond

Working Details of Entry Pavilion

Working Details of Walkways