For a richer surfing experience on our website, please update your browser. Update my browser now!
This feasibility study evaluates how Surat’s future growth, land-use expansion, and mobility patterns shape the need for a rapid transit system. The work benchmarks global systems, studies emerging technologies, and develops the Sprawl Scenario to understand shifting travel demand and corridor pressures. Using All-or-Nothing assignment and PT/private mode demand analysis, high-load corridors are identified and translated into a metro network including an Airport Spur. The final proposal outlines an 83-km network with 58 stations, demand-based operations, and TOD/interchange integration, positioning the metro as a response to measurable future travel needs rather than speculative expansion.