• Home
  • FP
  • UT4002
  • Surat Transit Network Feasibility Outlook - 2060

Bhatt Prachi Prafulkumar

UT4002

Surat Transit Network Feasibility Outlook - 2060

This project develops a feasibility framework for Surat’s future multimodal public transport network. It combines insights from 18 Indian metro DPRs and the New York Subway to benchmark operational, structural, and policy best practices. Using stargazing scenarios, future demographics, and lifestyle trends, the study models travel demand through EMME and evaluates three city-growth pathways—BAU, Compact, and Corridor. These scenarios inform mode share shifts, metro operations planning, and rolling stock requirements for 2030–2060. The study emphasizes building a full metro network early, strengthening multimodal integration, and using realistic demand projections to guide sustainable, long-term mobility planning for Surat.


Report Content

A pre-feasibility blueprint for Surat’s integrated, future-ready multimodal transport network.

Key insights from Agra’s metro DPR revealing heritage-sensitive planning and critical data gaps.

Comparative insights from 18 Indian DPRs and the New York Subway to benchmark best practices for Surat.

Envisioning India 2060 to align Surat’s mobility with emerging lifestyles and urban transitions.

How future city structures drive mode shift and shape Surat’s mobility transformation.

Mode share across scenarios reveal how urban structure and policy strength shape Surat’s PT future.

Projected PT dominance under Compact and Corridor futures driven by structural and policy shifts.

Big-push networks need larger fleets but deliver proportionally higher ridership returns.

Operational illustration of Surat’s highest-demand metro corridor in 2060.

Translating behavior insights into actionable mobility policies for a high-PT future.