Dhandhusariya Raj Rashmikant

SD4011

Design of 4 Lane RCC T-Girder River Bridge

The project focuses on analysis and design of a river bridge having deck slab with T-Girder having 20m span and 15.5m carriage way. Analysis has been as per respective IRC Standards (IRC SP13 for Hydraulic Calculations, IRC 6 for Loading, IRC112 for Superstructure Elements design and IRC 78 for Foundation design) using Grillage Analysis using STAAD Pro. software.


Report Content

Initial Studio Exercises

Project Description & Hydraulic Calculations

Dead Load, Live Load and Grillage Analysis

Braking and Wind Load Calculations

Water Current, Hydrodynamics and Buoyancy Force Calculations

Seismic Load Calculations & Design Ideology

Foundation & Pier Design

Pier Cap Design

Deck Slab Design

Girder Design