Disha Gattani

5734

SHIVALIK SHILP - II

The study project undertaken by the group is Shivalik Shilp II. The project is a proposed Thirteen storey commercial complex with three basements, located at Keshavbaug. The client for the Project is CTY STRUCTURES LLP, a joint venture between the Shivalik group and the Shilp group both based in Ahmedabad. The prime Contractor is Hi Tech Pvt. Ltd.  whose scope of work included RCC, Masonry and Plastering. The study done for this studio project is from Contractors end and the scope of study was from Foundation to Second basement’s floor slab The aspects of Construction Execution, Monitoring and Control and their relevant practices followed at site were studied in detail and suitable proposals have also been suggested as a part of the study. 


Report Content

Site Layout- Existing and Proposed

Construction Sequence

Construction Sequence

Plant and Machinary Insurance Policy Comparison

IS Codes- Prevalent and Proposed

Tools of Quality- Histogram

Tools of Quality- Control Charts

Proposed Safety Guidelines

Line of Balance- Column Casting Activity

Value Stream Mapping- PCC Casting Activity