The Project comprises of Analysis and Design of RCC continuous(Three span) voided slab bridge which is located at Bhuj, Gujarat. The centre to centre distance of bearing is 30m. The Superstructure was analyzed with the help of grillage method which was carried out in STAAD.Pro. Detailing of superstructure was carried out according SP:64 of IRC. The substructure was designed and detailed according to IRC and SP16. The pile foundation was analyzed according to IS 2911.


Report Content

Preliminary Data

General Arrangement Drawing - 1

General Arrangement Drawing - 2

Grillage Analysis

Static Check and Result Analysis

Design and Detailing of Superstructure

Design and Detailing of Pier Cap

Design and Detailing of Pier

Design of Pile

Detailing of Pile