• Home
  • FT
  • SD4005
  • DESIGN OF UHPFRC POST TENSIONED U GIRDER BRIDGE

Pathan Mohammadzaidkhan Mustufakhanpathan

SD4005

DESIGN OF UHPFRC POST TENSIONED U GIRDER BRIDGE

This project consists of a UHPFRC U-Girder Bridge with a post-tensioned superstructure, designed for an EJ-to-EJ span of 50 m and an overall carriageway width (CCW) of 24.610 m, accommodating 6 traffic lanes. The superstructure comprises post-tensioned UHPFRC girders supporting the deck slab, optimized for high strength, durability, and reduced prestress losses. The substructure includes rectangular reinforced concrete piers founded on open foundations, designed to safely transfer axial forces, bending moments, shear, and torsion to the soil. POT-PTFE bearings are provided at supports to allow controlled rotation and longitudinal movement, ensuring proper load distribution, thermal movement accommodation, and long-term structural performance.


Report Content

PROBLEM STATEMENT

GENERAL ARRANGEMENT & LOADING

GRILLAGE ANALYSIS & LOADING

DECK SLAB LOADING &DECK/DIAPHRAGM DESIGN

INITIAL STRANDS & TOTAL LOSS SUMMARY

STRESS CHECK & U-GIRDER FLEXURE CHECK

PIER & PIERCAP DESIGN

FOUNDATION

FOUNDATION DESIGN

STRUCTURAL DETAILING