The problem statement of the studio was to design a water supply and sewerage network for the city of Junagadh. The zones of Junagadh were divided among the students, out of which I am presenting the Zone 5. The flow of the studio was - Population projection, calculating water demand, tank sizing for the ESR, designing layout as per contours, running extended period simulation, optimizing and cost estimation, finalizing sewer layout as per contours, fixing design criteria and optimization and cost estimation.

View Additional Work

Report Content

Population Projection

Method Selection & Water Demand

WaterGEMs

Base Case & Tank Sizing

Water Design Iteration 1 & 2

Cost Analysis

SewerGEMs

Zone-03 Contour & Design Constraint

Sewer Design Iteration 1 & 2

Frequency Table & Cost Analysis