This project was developed under the Integrated Construction Practice (ICP) Studio, applying BIM and Lean methods for an Iconic Commercial High-Rise Building consisting of 3 basements and 29 floors. The studio focused on defining EIR, preparing a detailed BEP, and developing LOD 300–400 discipline-wise BIM models for coordination, clash detection, and model validation. Model-based QTO, 3D site layout planning, 4D sequencing, and 5D cost simulation strengthened decision-making and performance analysis. Last Planner System–based weekly tracking improved workflow reliability by identifying and removing constraints. Overall, the studio demonstrated how integrated BIM + Lean practices enhance coordination, reduce waste, and improve project delivery.


Report Content

Project Introduction

Role in Studio

4D and 5D Simulation Scope and Process

4D Simulation-Construction Sequence

4D Simulation-Use Case

5D simulation

LPS for Site Implementation

PPC Tracking

LPS for Site Implementation

Conclusion

Project Video